Viii. Deduction standard for construction deposit
If any construction unit or individual violates the provisions of
"Nantong International Convention and Exhibition Center
Construction Safety Regulations" and refuses to implement the
safety management requirements put forward by the venue, Nantong
International Convention and Exhibition Center has the right to
deduct part or all of the construction deposit in accordance with
the following standards. For units or individuals who seriously
violate the safety provisions of this manual and refuse to obey the
dissuasion, Nantong International Convention and Exhibition Center
has the right to make a decision on compulsory withdrawal.
1. If the construction unit fails to equip qualified and effective
fire extinguishers according to the regulations, the construction
deposit of 500 yuan will be deducted.
2. If the construction personnel enter the operation without safety
helmet and do not listen to the dissuasion, the construction
deposit of 200 yuan/person/time will be deducted.
3. Construction personnel on the ladder more than 2m (including)
above the height of the operation, the ladder is unguarded, the
violator will deduct the construction deposit of 200
yuan/person/time.
4. If the aerial workers of the construction unit operate without
licenses, or are operated by unlicensed personnel, the construction
deposit of 2000 yuan/person/time will be deducted.
5. The construction unit does not listen to the dissuasion to build
materials to occupy the fire channel, the violator will deduct the
construction deposit of 500 yuan/place/time.
6. If the actual connection switch of the booth electrical box of
the construction unit is inconsistent with the declared
specifications, the construction deposit of 2000 yuan is deducted
for refusal to rectify.
7. The construction unit shall ensure that the electric box of the
venue is clean and tidy, and paint is sprayed on the electric box.
A deduction of 200 yuan/piece will be made.
8. The construction unit shall not move and disassemble the
electric box of the venue without permission, and the construction
deposit of 2000 yuan/place/time shall be deducted.
9. If the construction unit illegally uses alcohol, diluent and
flammable products, the construction deposit of 500 yuan/place/time
will be deducted.
10. If the construction unit illegally uses the grinder to cut
metal items to generate sparks, the construction deposit of 500
yuan/place/time will be deducted.
11. If the construction unit violates the rules and brutally
disassembles the exhibition during the withdrawal period and pushes
or pulls down the exhibition booth as a whole, the construction
deposit of 2000 yuan/place/time will be deducted.
12. The construction unit shall not leave the booth structure,
decorative materials and other waste in the pavilion, back yard and
around the venue, the corresponding construction deposit will be
deducted according to the circumstances.
13. During the construction period, if the construction unit does
not listen to the dissuasion of the venue, resulting in the
collapse of the booth, door, backboard and other structures, all
the construction deposit will be deducted.
14. If the construction unit violates the provisions of this manual
and causes property losses to either party, the violator shall
deduct the construction deposit of 10,000 yuan/time, and deduct the
compensation for property losses according to the personal and
property losses.
15. If the construction unit violates the provisions of this manual
and causes personal injury or death to either party, the violator
shall deduct all the construction deposit and investigate the
violator's legal responsibility in accordance with relevant laws
and regulations.
The construction unit shall take full responsibility for all safety
accidents caused by casualties, fire and damage to the building
facilities, etc. caused by violation of the above regulations
during the construction, withdrawal and transportation of the
building, and bear all reputation and economic losses caused to
Nantong International Convention and Exhibition Center.
The construction unit shall carry out the construction in strict
accordance with the above requirements and relevant rules and
regulations. If there is any violation, Nantong International
Convention and Exhibition Center will deduct the corresponding
construction deposit according to the seriousness of the
circumstances.