Sign In | Join Free | My infospaceinc.com
infospaceinc.com
Products
Search by Category
Home >

Current Transformer Full Performance Test Bench (Current Transformer Comprehensive Test Bench)

Categories High Voltage Withstand Test
Price: 20000-40000
secondary voltage: 100 V; 100/√3 V
secondary current: 5 A,1A
accuracy: 0.05%
primary current: 5A--5000A
primary voltage: 6KV--220KV
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Current Transformer Full Performance Test Bench (Current Transformer Comprehensive Test Bench)

Used to test all performance parameters of current transformers, such as error, insulation resistance, primary withstand voltage, secondary withstand voltage, and turn-to-turn insulation, etc

Used to test all performance parameters of voltage transformers, including error, insulation resistance, primary withstand voltage, secondary withstand voltage, partial discharge, etc

The three-phase mutual inductor calibration device is an important equipment for measuring the error of the mutual inductor in the calibration box. This device consists of a three-phase voltage regulator, a three-phase mutual inductor load box, a three-phase standard mutual inductor, and a three-phase mutual inductor calibration instrument, which serves as the basis for the error measurement of the mutual inductor.

The following components must be provided according to actual requirements: voltage regulator, load box for current transformer, standard current transformer, and current transformer calibration instrument.

Testing requirements for current transformers and voltage transformers with the following specifications: voltage level ≤35kV and rated current ≤5000A.
The test items include: Current Transformer:
1) Accuracy test;
2) Primary end power frequency withstand voltage test;
3) Capacitance and dielectric loss factor measurement;
4) Interphase power frequency withstand voltage test;
5) Secondary end power frequency withstand voltage test;
6) Secondary winding resistance (Rct) measurement;
7) Turn-to-turn overvoltage test;
8) Secondary circuit time constant measurement;
9) Rated turn-off potential and rated turn-off excitation current test;
10) Turn-to-turn overvoltage test;
11) Remanence coefficient measurement;
12) Instrument security factor measurement for current transformers.
Voltage transformer:
1) Accuracy test;
2) Excitation characteristic measurement;
3) Primary end power frequency withstand voltage test;
4) Capacitance and dielectric loss factor measurement;
5) Interphase power frequency withstand voltage test;
6) Secondary end power frequency withstand voltage test

Buy Current Transformer Full Performance Test Bench (Current Transformer Comprehensive Test Bench) at wholesale prices
Send your message to this supplier
 
*From:
*To: Wuhan Xinfeixiang Electric Power Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0