10TPH Walking Bottom Reheating Furnace
![]() |
...; the blank is spread out at intervals at the bottom of the furnace or on the beam, which can be heated evenly faster. The fault of arch steel and sticking steel of pusher-type heating furnace is completely eliminated, so that the length of furnace is...
Wuxi Yushun Metallurgical Technology Co., Ltd.
|
ASME High Pressure Stainless Steel Superheater And Reheater For Power Plant Boiler
![]() |
...boilers. According to the position and structure of the superheater in the boiler arrangement, it can be divided into: wall superheater on the wall surface of the furnace; separator and rear screens at different locations in the upper part of the hearth;...
SuZhou Saneco boiler co.ltd
|
ASTM A106 A53 Gr. B A336 API 5L Seamless Steel Pipe Ms Alloy Large Diameter Thick Wall Sch40 Sch80 Seamless Fluid Boiler Tube Pipe
![]() |
... rounds, or billets, being cut to a specified length and sent through a walking-beam reheat furnace, where temperatures reach nearly 2,300°F. After exiting the reheat furnace, the preheated rounds are turned into a tube shell in the rotary piercing mill......
Shandong Zhengde Metal Manufacturing Co., Ltd
|
Casting Steel Mill Double Girder Overhead Crane 30 Ton High Work Efficiency
![]() |
...metal smelting, tie-making and hot processing. The following ground loading crane, open-hearth loading bridge crane, forging crane, quenching crane, stripping crane, lifting crane, clamp crane, slab turnover crane, material box crane, reheating furnace...
Henan Silence Industry Co., Ltd.
|