Creativity Shapes a Brighter Future
Professionalism Redefined - Exceptional Efficiency1. Team of Experts
Our company boasts a dynamic and enterprising service team composed
of skilled professionals in construction, landscape architecture,
structural engineering, water supply and drainage, electrical
systems, HVAC, and cost management. We provide cutting-edge
technology, state-of-the-art equipment, and impeccable service.
2. Unparalleled Efficiency
Human-Centric Intelligent Enterprise Management Platform
Harness Deep Technical Heritage to Fuel Innovation
Custom-Tailored and Highly Efficient Services for Our ClientsConstruction Qualification Services
| electric power design |
| Photovoltaic power generation project |
| Cogeneration project |
| Architectural engineering professional contracting |



Post-Sales Instructions
1. Design Cost
Design fees vary depending on the unique circumstances and
requirements of each project. The complexity of design tasks can
differ significantly, hence the variation in fees. We will provide
a reasonable quotation based on your specifications. The final
product price may differ from the initial project quote.
2. Design Content
Ensure all necessary design details are communicated prior to
project initiation, as changes are not allowed once design work
commences. For any modifications needed during the design process,
please contact customer service for fee negotiations. Accurate and
complete design-related materials are essential, as we do not
provide free corrections for errors due to incorrect or incomplete
information.
3. Design Adjustments
Upon receiving the design plan, please review it carefully.
Post-finalization, designers are not obligated to make
modifications. However, free fine-tuning is available within one
month, depending on difficulty. Complex modifications will incur
additional charges.
4. Design Refund Policy
Design services are customized; therefore, a seven-day
unconditional return is not supported. Refunds are not accepted
once all drawings or source documents are confirmed received by the
customer. Refunds or negotiations can occur before receipt
confirmation.
Once the source document is received, please store it securely, as
the company has no obligation to retain it. Each project reflects
the designer's hard work and dedication, often involving late
nights and overtime. Your understanding is appreciated!Frequently Asked Questions (FAQ)What we offer
1. Professional strength:
We have an independent design institute with professional engineers
in various systems of power plants with many years of experience,
who can provide advice for power projects of all sizes.
2. Product strength:
We have established long-term cooperative relations with well-known
domestic OEMs, whose products adopt the most advanced technology
and have guaranteed quality. They provide us with equipment at
relatively competitive prices. Our performance table is enough to
prove that our products and services are very competitive.
3. Delivery Time:
We guarantee and provide competitive delivery time. To achieve this
goal, we will strictly manage the following steps:
1. Our independent design institute can ensure the design progress;
2. Our long-term and stable cooperative manufacturers will give
priority to our orders;
Three: Our experienced and professional team can solve problems and
prevent risks to avoid potential delivery delays.
4. After-sales service;
Many owners will worry about this, especially for international
power projects. We provide comprehensive after-sales services, such
as a one-to-one service system to reduce your risks; regular return
visits; customer files; a global maintenance team, etc.
>>