| Sign In | Join Free | My infospaceinc.com |
|
| Categories | Water Well Drilling Rig Machine |
|---|---|
| Brand Name: | Shitan |
| Model Number: | Tractor self-propelled well drilling machine |
| Place of Origin: | Jinzhou ,Hebei Province |
| MOQ: | 1 SET |
| Price: | Negotiate |
| Payment Terms: | TT,Western Union |
| Supply Ability: | 1000 Sets Monthly |
| Delivery Time: | 7 days after payment |
| Packaging Details: | Wooden Box |
| Product Name: | Tractor Self-propelled Well Drilling Machine Water Well Drilling Rig |
| Drilling Diameter: | 150-500mm |
| Power Source: | Electricity,Diesel |
| Drilling Depth: | 100 Meters |
| Movement speed: | 2.5Km/h |
| Overall size: | 4000*1600*2680 |
| Weight: | 2.8T |
| Clamping Capacity: | 30° MAX |
| Company Info. |
| Jinzhou City Shitan Machinery Equipment CO. LTD. |
| Verified Supplier |
| View Contact Details |
| Product List |
| Parameter | Value |
|---|---|
| Drilling Depth | 100 Meters |
| Weight | 2.8T |
| Rod Hole Diameter | 60mm |
| Drilling Diameter | 150 - 500mm |
| Power Source | Electricity, Diesel |
| Movement Speed | 2.5Km/h |
| Overall Size | 4000*1600*2680 |
| Tractor Power | 36 HP |
| Torque | 260 N.m |
| Electric Motor | 11W |
| Clamping Capacity | 30° MAX |
| Generator | 30 kw |
1, Comprehensive inspection and debugging of equipment
Core power system verification: Focus on checking the fuel, oil,
and coolant reserves of the 36 horsepower tractor to ensure no
leakage; Test whether the circuit connections of the 11 kW motor
and 30 kW generator are firm, the wiring terminals are not loose or
oxidized, and the grounding protection device is normal; Start the
power system and conduct a no-load test run for 5-10 minutes,
monitor for any abnormal noise, observe whether the speed and
torque output are stable, and confirm that the power matching is
normal.
Inspection of key operational components: Verify that the drill rod
and drill bit are free from wear, deformation, and cracks, and that
the connecting threads are intact; Test the opening and closing
flexibility of the clamping device, confirm that the maximum 30 °
clamping angle adjustment function is normal, the clamping force is
sufficient, and there is no jamming; Check the sealing of hydraulic
pipelines and oil pipes to ensure no oil leakage and that the
pressure values meet the equipment standards.
Confirmation of auxiliary system: Check that the equipment
instruments (tachometer, pressure gauge, temperature gauge) display
normally and there are no fault alarms; Confirm that the connecting
components of the traction device (hooks, pins) are secure and
undamaged, and that the braking system is sensitive and effective;
Clean up debris and rust on the surface of equipment and work
areas, and apply lubricating oil to moving parts if necessary.
2, Workplace planning and adaptation
Site selection requirements: Choose a solid and flat site, with a
ground bearing capacity that is suitable for equipment weighing 2.8
tons. Avoid working on soft, muddy, or slopes exceeding 5 degrees
to prevent the aircraft from tipping over; Stay away from obstacles
such as high-voltage lines, buildings, and underground pipelines,
and reserve at least 3 meters of operating space to ensure
unobstructed traction and drilling operations.
Site preparation: Clean up stones, weeds, and waste materials in
the site, level the raised or sunken areas of the ground; If
working in soft fields such as the wild or farmland, steel plates
or crushed stones need to be laid to enhance the ground bearing
capacity; Designate a safe area for homework, set up warning signs,
and prohibit unrelated personnel from entering.
Confirmation of environmental suitability: confirm that the weather
conditions in the operation area are suitable, and avoid carrying
out preliminary preparation and subsequent operations in severe
weather such as rainstorm, gale, thunder and lightning; According
to the geological survey report, understand the soil and rock
conditions in the work area, and match suitable drill bits and
drilling parameters in advance (such as preparing high-strength
drill bits for hard rock layers).
3, Personnel Qualification and Protection Preparation
Qualification review of operators: Operators must undergo
professional training, be familiar with the structure, operating
procedures, parameter limitations (such as maximum drilling
diameter of 500mm and depth of 150m), and safety regulations of the
ST-150T drilling rig. After obtaining relevant operating
certificates, they must work with certificates and are strictly
prohibited from operating without certificates.
Protective equipment: Operators must wear a complete set of
protective equipment, including safety helmets, anti slip and
wear-resistant work shoes, protective gloves, and goggles, to avoid
direct contact with moving parts or accidental injury from flying
debris; A first aid kit should be provided at the work site,
containing emergency supplies such as tourniquets and
disinfectants.
Pre job training and communication: Organize pre job briefing for
operators to clarify job objectives, processes, and risk points;
Confirm that the operator has mastered the emergency shutdown
method of the equipment, is familiar with the functions of each
button and switch, and avoids misoperation.





|