| Sign In | Join Free | My infospaceinc.com |
|
| Categories | PP Strap Making Machine |
|---|---|
| Brand Name: | JIATUO CHINA |
| Model Number: | JTPP-100 |
| Certification: | IS CEO |
| Place of Origin: | CHINA |
| MOQ: | 1 SET |
| Price: | Negotiable |
| Payment Terms: | L/C,D/A,D/P,T/T |
| Supply Ability: | 20sets/month |
| Delivery Time: | 30-40days |
| Packaging Details: | plastic film |
| Strap Core Type: | Paper/Plastic |
| Power Supply: | 380V/220V |
| Video outgoing-inspection: | Provided |
| Strap Material: | PP Recycle Material/New Raw Material |
| Warranty: | 1 Year |
| Key Selling Points: | Lead To Germany Japan Technology |
| Strap Width: | 5-19mm |
| Screw diameter (mm): | 100mm |
| thickness: | 0.3-1.2mm |
| Capacity: | 230-260kg/H |
| Company Info. |
| SHENZHEN JIATUO PLASTIC MACHINERY CO.,LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
Technical specification of PP 2straps output production line
| 1 | Materials | Polypropylene PP raw material pellets, recycled pellets. |
| 2 | Product | PP strap (1 mould for 2 straps) |
| 3 | Capacity | 100-120kg/h |
| 4 | Total install power | 80kw, (actual power consumption is 40-50%) |
| 5 | Strap width | 5mm-19 mm |
| 6 | Thickness | 0.4 mm-1.2 mm |
| 7 | Manpower | 2person/shift |
| 8 | Workshop required | L (30m) ×W (2m) ×H (4m) |
| 9 | Power source | 380V, 50Hz, 3Phase (according to customer requirement) |
| 10 | Electric components | Schneider |
| 11 | Inverter | INVT |
| 12 | Switches | Fotek |
| 13 | Motor power | GUGAO |
Feature of PP strap production line
Application of PP strapping
- Logistics industry: used for bundling of cartons, wooden boxes and other packaging.
- Building materials industry: bundled steel, aluminum, wood, etc.
- Papermaking industry: bundled paper, paper rolls, etc.
- Other industries: packaging and bundling in electronics, food, chemicals and other
fields.
FAQ
Q1:What about the payment terms?
A1:Always 30% down payment as deposit,70% balance pay before
shipping.
Q2:What about the payment way?
A2:TT,L/C at sight or MIC trade assurance.
Q3:If you will send engineer coming to our factory to install and
test the machines?
A3:Yes,Every set of machine we will send professional engineer to
your factory and help installation and test the machines for you.
Q4:If you have CE,SGS,ISO certificate?
A4:Yes,except these,if you also need other certificates,we also can
help to apply.

|