Sign In | Join Free | My infospaceinc.com
infospaceinc.com
Products
Search by Category
Home > Other Luggage, Bags & Cases >

High Elongation PU Waterproof Coating Two Component For Crack Bridging

Categories PU Waterproof Coating
Supply Ability: 1000000kg per Month
Surface Drying Time: ≤12 h under standard condition
Brand Name: shhous
Temperature/Humidity: Construct at 5℃-35℃; low temp slows curing; avoid rainy and dewy days
Model Number: two‑component
Substrate: Substrate must be solid & dry, free of standing water, dust and oil; interface treatment required for damp surface
MOQ: 1000kg
Chemical Resistance: Resistant to water, acid, alkali and salt corrosion
Price: USD 1.3‑1.5/kg
Solid Content: ≥92 %
Packaging Details: Metal Barrel
Through‑curing Time: ≤24 h under standard condition
Certification: ISO
Ventilation: Keep ventilated, avoid inhaling volatile gas, wear protective equipment
Place of Origin: Shandong, China
Application Method: Cold‑applied by troweling or brushing
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

High Elongation PU Waterproof Coating Two Component For Crack Bridging

High-elongation Two-component Polyurethane Coating For Crack-bridging


Advantages for Bathroom

  1. High film elasticity: High tensile strength and elongation, resists thermal expansion‑contraction and micro‑cracks of substrate, prevents water‑leakage caused by floor slight deformation.
  2. Seamless waterproofing: Reactive liquid‑formed film fully covers corners, pipe roots and floor drains without joints, reduces leakage risk at high‑risk positions.
  3. Strong adhesion: Firm bonding to cement‑mortar substrate, less hollowing, blistering and delamination.
  4. Long‑term water immersion resistance: Stable performance under long‑time soaking, ideal for shower area waterproofing.
  5. Mildew & corrosion resistance: Adapt to hot‑humid bathroom environment, resist sewage corrosion.
  6. Excellent water‑pressure resistance: Dense film with strong impermeability to stop water seepage to lower floors.
  7. Good for detail treatment: Extra‑thick coating around pipe roots and floor drains to reinforce high‑leakage‑risk zones.
  8. High mechanical strength: Cured rubber‑like film resists impact, hard to damage during tile‑laying work.
No.ItemPrecautions
1SubstrateSubstrate must be solid & dry, free of standing water, dust and oil; interface treatment required for damp surface
2Mixing RatioWeigh A & B strictly by weight ratio; wrong ratio causes uncured sticky or brittle film
3StirringElectrically stir 3-5min until uniform; poor mixing causes partial curing failure
4Pot-lifeUse up within pot-life after mixing; discard gelled material, do not dilute with water
5Coating LayersApply thin multi-coats in cross directions; avoid heavy coat to prevent blistering & sagging
6Temperature/HumidityConstruct at 5℃-35℃; low temp slows curing; avoid rainy and dewy days

Application Method for Bathroom

  1. Substrate preparation: Keep bathroom floor & wall solid and flat. Remove dust, oil and loose mortar. Plug holes and repair cracks. Keep substrate dry without standing water.
  2. Detail reinforcement: Apply 1‑2 coats of two‑component polyurethane as extra layer for pipe roots, floor drains and corners, width ≥250mm per side. Proceed to main‑area construction after drying.
  3. Proportion & mixing: Weigh component A and B strictly by weight ratio. Electrically stir for 3‑5 minutes until uniform without particles. Use mixed material within pot‑life, do not dilute with water.
  4. Multi‑layer trowel application: Apply thin coats repeatedly; single heavy coat is forbidden. Apply next coat after previous coat dries, brush in cross directions. Total film thickness for floor ≥1.5mm; shower‑zone wall height ≥1.8m, other walls ≥300mm.
  5. Curing: Natural full curing. Forbid treading and water contact during curing period.
  6. Water‑storage test: Carry out 24‑48 hours water‑storage test after full curing. Pass test if no leakage downstairs.
  7. Protective layer & tile work: Apply cement‑mortar protective layer after qualified water test, then lay ceramic tiles.


Buy High Elongation PU Waterproof Coating Two Component For Crack Bridging at wholesale prices
Send your message to this supplier
 
*From:
*To: Weifang Shihua Chemical Building Material Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0