| Sign In | Join Free | My infospaceinc.com |
|
| Categories | High Speed Centrifugal Pumps |
|---|---|
| Pump Model: | HSCP Compact Vertical OH6 |
| Brand Name: | Sunstrand |
| Place of Origin: | China |
| Skid Dimensions: | 1.2 m x 2.4 m (Typical) |
| Startup Time: | Less Than 4 Hours After Positioning |
| Included Systems: | Pump, Motor, Seal System, Local Control Panel, Baseplate |
| Payment Terms: | T/T,L/C |
| Motor Power: | Up to 56 kW (75 HP) |
| Application: | Chemical Dosing, Fuel Gas, Utilities |
| Delivery Time: | 45 Days |
| Packaging Details: | Steel Frame Skid, Weatherproof Wrap, Export Documentation |
| Model Number: | SKID-HSCP-01 |
| Supply Ability: | 15 Sets per Month |
| Maximum Flow: | 57 m³/h (250 GPM) |
| Package Type: | Fully Assembled Skid-Mounted Unit |
| MOQ: | 1 Set |
| Maximum Head: | 442 m (1,450 ft) |
| Certification: | ISO 9001:2015, CE, API 610 |
| Price: | Negotiation |
| Company Info. |
| Sunstrand Fluid Handling Co., Ltd.(China) |
| Verified Supplier |
| View Contact Details |
| Product List |
Our skid mounted pump program originated from a 2016 project where a Southeast Asian refinery requested a completely factory-integrated chemical injection pump package that could be installed and commissioned within a single 12-hour shift during a planned unit turnaround. The project's schedule constraint—installation during a 48-hour total turnaround window with only one 12-hour shift allocated for pump installation—necessitated a fundamental rethinking of our traditional pump delivery approach.
The resulting compact skid mounted vertical high speed process pump package, factory-assembled and string-tested before shipment, was positioned, connected, and commissioned in 7 hours, contributing to the refinery's successful achievement of their turnaround schedule. This practical demonstration of the skid-mounted concept's value led to the formal development of our modular plug-and-play pump product line, which has now been adopted for over 80 installations in chemical dosing, fuel gas conditioning, seal flush, and utility water services.
Every skid mounted pump package is assembled, aligned, and tested as a complete system in our factory integration bay before shipment. The factory acceptance test replicates site operating conditions as closely as possible within our test facility capabilities, including mechanical running tests, seal support system verification, functional testing of all instrumentation loops, and a 4-hour uninterrupted run with comprehensive data recording.
| Parameter | Specification | Factory Verification |
|---|---|---|
| Package Configuration | Single-Lift Skid-Mounted Assembly | Certified lift test with weight report |
| Pump Type | API 610 12th Ed., OH6 Vertical Integrally Geared | Performance test per API 610 |
| Maximum Flow Rate | 57 m³/h (250 GPM) | Magnetic flow meter, calibration cert |
| Maximum Differential Head | 442 m (1,450 ft) | Pressure transmitters, deadweight-tested |
| Motor Power Range | 15 to 56 kW (20 to 75 HP) | Motor solo-run test certificate |
| Skid Footprint (Typical) | 1.2 m * 2.4 m (4 ft * 8 ft) | As-built dimensional report |
| Seal System | Integral API 682 Cartridge, Plan per Service | Seal air test, system function check |
| Instrumentation | Pressure, Temperature, Vibration, Level | Loop check, calibration certs |
| Control Interface | Local Panel with Dry Contacts for DCS | I/O point-to-point continuity test |
| Surface Treatment | SA 2.5 Blast, Multi-Coat Paint System | DFT measurement, adhesion test |
| Documentation | Full FAT Report + As-Built Drawings | Issued within 2 weeks of FAT completion |
This has occurred on approximately 3% of our skid mounted pump FATs based on our quality records, and we have a defined corrective action process that we follow transparently. If the measured performance deviates from the guaranteed values by more than the test instrument uncertainty allowance, we stop the test and perform a structured troubleshooting investigation. The corrective action, re-test, and final results are documented in the FAT report. We do not ship a pump that has not demonstrated its guaranteed performance on our test stand.
Control system integration is addressed during the order engineering phase, not during site commissioning when schedule pressure is highest. We request the client's control system interface specification during the engineering review within 4 weeks of order acceptance. Our local control panel is configured to match these interface requirements, with all terminals labeled per the client's cable schedule. During FAT, we simulate DCS commands and verify all feedback signals using a test box that mimics the client's control system inputs.
Yes, and this is one of the operational advantages our clients have identified from the skid-mounted approach. The entire pump package remains a self-contained, single-lift assembly throughout its operational life. We have documented cases where clients have relocated skid mounted pump packages to different process units during plant reconfigurations, with the relocation completed during a normal maintenance window without requiring civil or structural modifications.
|