Sign In | Join Free | My infospaceinc.com
infospaceinc.com
Products
Search by Category
Home > Construction Tools >

Workover Rig Components Supplied Worldwide For Oilfield Projects

Categories Workover Rig Components
Model Number: disc brake-350
MOQ: 1 pcs
Working calipers (set): 2
Safety calipers (set): 1(2)
Payment Terms: L/C, T/T
Safety braking torque (kN·m): 28/56
Workover rig model: XJ350
Maximum Hook Load (kN): 900
Certification: API
Delivery Time: 15-30 working days
Working brake torque (kN·m): 61
Brand Name: XI'AN RIG
Place of Origin: China
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Workover Rig Components Supplied Worldwide For Oilfield Projects

Wellhead Equipment and Well Control Safety System (Workover Safety Barrier Assembly)


Workover operations face pressurized wells, oil and gas wells, overflow wells, and sand-producing wells, making well control equipment of paramount importance.

1. Wellhead Christmas Tree Assembly

Comprising gate valves, a cross (spool), casing head, and tubing hanger, it is the main wellhead equipment of oil and water wells. Workover operations require coordination of opening, closing, disassembly, and makeup operations on it.

2. Workover Blowout Preventer (Simple BOP, Ram BOP)

Lightweight well control equipment dedicated to workover operations. During operations, it seals the wellhead and prevents kicks, blowouts, upward migration of oil and gas, and overflow of oil and water, ensuring the safety of operations on pressurized wells.

3. Wellhead Sealer and Self-Sealing Wellhead (Snubbing/Stuffing Box Type)

Automatically seals the annulus as tubing runs in and out during operations, preventing well fluids, oil, and gas from spraying out — the most commonly used safety component in routine workovers.

4. Choke Manifold and Flare (Flow) Line

Used for pressure relief, flaring, and choke-controlled pressure regulation, safely releasing wellbore pressure under abnormal conditions and smoothly controlling wellhead pressure.

5. Pressure Monitoring Gauges — Tubing Pressure and Casing Pressure Gauges

Monitor tubing pressure and casing pressure in real time, judging the downhole oil and gas activity and formation pressure changes, and guiding kill and pressure-control operations.

Workover rig modelWorking calipers (set)Safety calipers (set)Maximum Hook Load (kN)Working brake torque (kN·m)Safety braking torque (kN·m)
XJ250216756128
XJ35021(2)9006128/56
Buy Workover Rig Components Supplied Worldwide For Oilfield Projects at wholesale prices
Send your message to this supplier
 
*From:
*To: Xi'an Rig Oilfield Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0