Sign In | Join Free | My infospaceinc.com
infospaceinc.com
Products
Search by Category
Home > Road Machinery >

Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer

Categories Mobile Concrete Batching Plant
Brand Name: ZHENHENG
Model Number: Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Certification: SGS, ISO, BV, CE
Place of Origin: HENAN CHINA
MOQ: 1 set
Price: Negotiation
Payment Terms: L/C, D/A, D/P, T/T
Supply Ability: 30 sets per month
Delivery Time: 7-15 working days after confirm order
Packaging Details: Export standard container: 20GP or 40GP, 40HC
After-sales service provided: Engineers available to service machinery overseas
Product name: Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Power Type: 3phase,50hz,38v
Max. Aggregate: 80/60mm
Warranty: twelve month
Machine Type: Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Color: Customer Required
Application: Building Works
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer

Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer


Product Description of Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer


Principles of Mobile Concrete Batching Plant:
Mobile concrete batching plant is consist of aggregate loading system, electric auto-measurement system. The core of the whole system is the auto-measurement controlled by computer, which will operate the feeding quantity of cement, sand, gravel, keep the mixture ratio of concrete strictly, to ensure the production quality.
The system works by high-tech of mechanical and electrical integration, establish the auto-running of electronic weighing and feeding trolley and chain procedures. It will also effective organized the generally used machinery in the construction enterprises, such as the concrete mixer, engineering vehicles, belt conveyors, etc, play their best performance.

Technical Parameters of
JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant

No.ModleYHZM20
/Theory Capacity20m³/h
Loading Suggestion40HC*2
Total Power42kw
Total Weight12T
1Aggregate System
ModlePLD800-2Bins
Storage Vloume4m³*2
Weighing Hopper800L
Motor Power4kw*2
2Mixing System
ModleJZM500
Charging Volume800L
Discharging Volume500L
Theory Capacity20 m³/h
Mixing Motor Power4.5kw*2
Water Pump Power0.75kw
Discharging Height1100mm
3Measurement System
Cement Weighing SystemYes
Water Weighing SystemYes
Additive Weighing SystemYes
4Pneumatic System
Air Compressor0.36m³
5Control System
Aotomatic Control CabinetYes
6Screw ConveyorLSY219*6M*7.5kw
7Cement Silo50T*1



The main features of
JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant:
A: The overall layout
Modular design,easy to disassemble.
B:structure characteristics
Unique water supply lines, automatic water supply system, reduced water time and increased production efficiency by 20 %
C:Traction mode
Trailer traction, easy to move and walk.
D: Control System
One-button start mode, simple operation, stable and reliable performance.

a. Tires: Double tires, strong pressure bearing capacity, strong stability, non-slip.
b. Support leg: Quick disassemble and assembly, stabilize machine during work, protect tires, and extend service life.
c. Universal Steering wheel: can be dragged by a medium-sized forklift directly, ensure the direction changing stably.
d. Storage hopper base: moved from the middle to the front generating two advantages:
a). remaining space can be used for the generator, control cabinet, water tank, tool box, etc.;
b). shorten the length of the feeding belt and the feeding time, thereby shortening the single mixing cycle by 10s, and improving the working efficiency.
e. Support steel: Increase the bearing capacity of the chassis and extend the service life.
Compact structure: Movable completely, work on the supporting legs, No foundation needed.

Concrete Drum
1.Theory Capacity: 20 m³/h
2.Mixing Motor Power: 4.5kw*2
3.Water Pump Power: 0.75kw
4.Discharging Height: 1100mm(Adjustable)

Aggregate Batching Machine
1.Storage Volume: 4m³*2
2.Weighing Hopper: 800L
3.Motor Power: 4kw*2

Water, Cement and Additive Scales
1. Cement weighing accuracy: ±1%
2. Water weighing accuracy: ±1%
3. Additive weighing accuracy: ±1%


Certifications:


Since ZHENHENG has been established, we have paid the great attention to improvement our quality. In recent years, we have made breakthroughs in market access and qualification certification, provided equipment to consumers with excellent product quality.



Q: Can we visit your factory?
A: Yes. You can visit our factory at anytime you want.
Q: Can you put our logo on the machine?
A: Yes,it is available.LOGO and color are usually as per customer's requirement.
Q: What’s the warranty time?
A: From the date of shipment, 1 year or 1500working hours, whichever comes first.
Q: What’s your payment term?
A: We accept T/T(30% down payment and balance before shipping) and L/C mostly, but if you prefer other payment terms please contact us for further information.
Q: How long is your delivery time?
A: Usually, it is 7-10 workdays if the goods are in stock, or it is 15-20 working days if the goods are not in stock, it is according to quantity.

More photos of
JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant




Buy Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer at wholesale prices
Send your message to this supplier
 
*From:
*To: Zhengzhou Zhenheng Construction Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0