Sign In | Join Free | My infospaceinc.com |
|
Categories | Tungsten Carbide Seal Ring |
---|---|
Place of Origin: | Sichuan, China |
Brand Name: | Kedel |
Model Number: | Customized |
Supply Ability: | 1000000 Piece/Pieces per Week seal ring tungsten carbide sleeve |
Packaging Details: | export standard packageMinjiang Minjiang Hot Sale Mechanical solid carbide stationary seal ring tungsten carbide sleeve |
MOQ: | 50 Piece/Pieces |
Price: | $2.60 - $46.60 / Piece |
Certification: | ISO9001:2015,SGS, |
Material: | Tungsten Carbide |
Usage: | carbide shaft seal ring |
Hardness: | 86-93HRA |
Finishing: | Polished |
Product name: | Tungsten Carbide Seal Ring |
MOQ: | 10pcs |
Grade: | YG8C, YK05, etc |
sample: | Available |
Product Material: | 100% Original Tungsten Cabride |
HRC Hardness: | 69-81HRC |
Company Info. |
Chengdu Kedel Technology Co.,Ltd |
Verified Supplier |
View Contact Details |
Product List |
Mechanical seal rings are used as Mechanical Seal Faces in pumps,
Compressors and Agitators.
Carbide Seal Rings are used in oil refineries,Petrochemical plants,
Fertilizer Plants and Drug/Pharmaceutial Industries.
Mechanical Seal Rings are developed to withstanding high
temperature, high pressure & highly corrosive chemical attack.
Our advantages:
1. Use 100% Raw material, strict incoming inspection.
2. Overpressure sintering, increasing the densification of the alloy teeth and increasing the 30% life span.
3. Can be customized according to the requirements of the customer.
Production Process
Milling--Proportioning as required--Wet grinding--Dry--Granulation--Press--Sinter--Inspection--Package
Specifications
there are tungsten carbide bushing specifications as below showed, we also accept your inquiry with drawings.
Packing Details: Packing cnc carbide turning inserts, use plastic foam, solid plastic box and carton.
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shippment.
![]() |