| Sign In | Join Free | My infospaceinc.com |
|
| Categories | Shutter Door Roll Forming Machine |
|---|---|
| Brand Name: | FMS |
| Certification: | ISO CE |
| Place of Origin: | CHINA MAINLAND |
| MOQ: | 1 Set |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T, D/A, D/P |
| Supply Ability: | 20 Sets Per Month |
| Delivery Time: | 30 Working Days |
| Packaging Details: | 20' FLC |
| PLC: | Brand |
| Forming stations: | according to you profile drawings |
| Rollers material: | GCr15,Cr12,SKD11 quenching treatment:HRC58-62(optional) |
| Voltage: | 380V 50Hz 3phases |
| Length precision: | ±0.3mm/10m |
| Whole line working speed: | 0-25m/min |
| Product Name: | High Speed Roller Shutter Door Roll Forming Machine Full Auto |
| Way of drive: | chain drive,Gearbox drive(optional) |
| Company Info. |
| Cangzhou Famous International Trading Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
High Speed Roller Shutter Door Roll Forming Machine Full Auto
Specification
| No. | Item | Description |
| 1 | Coil | Galvalume, Galvanized |
| 2 | Raw Material Thickness | 0.8mm - 1.0 mm |
| 3 | Working Speed | 20-30 m/min |
| 4 | Roller Station | 12 Stations |
| 5 | Inverter | Yaskawa,Mitsubishi, (option Brand) |
| 6 | PLC | Yaskawa,Mitsubishi, (option Brand) |
| 7 | Electrical Control System | Delta PLC (can be customized) |
| 8 | Cutting system | pre cutting,hydraulic post cutting,servo Tracking cutting |
| 9 | Punching system | hydraulic punching ,punching press machine(option) |
| 10 | Power Supply | 380V, 60HZ, 3 PHASES(can be customized) |
| 11 | Length precision | ±0.3mm/10m |
| 12 | Driving Mode | Gear Wheel |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.

|