| Sign In | Join Free | My infospaceinc.com |
|
| Categories | Precision Mould Parts |
|---|---|
| Brand Name: | SENLAN |
| Model Number: | CI-032 |
| Certification: | ISO 9000 |
| Place of Origin: | China |
| MOQ: | 1Pcs |
| Price: | Negotiable |
| Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| Supply Ability: | 20000Pcs/Week |
| Delivery Time: | 5-20 Days |
| Packaging Details: | Coated with Anticorrosive Oil, Packed in Carton Box |
| Hardness: | HRC60 |
| Accuracy: | +/-0.005mm |
| Surface Treatment: | Polished, Tin, Ticn, Crn, Dlc |
| Product Name: | Mold Core Insert |
| Quality: | High Quality |
| Shaping Mode: | Plastic Die Mould |
| Product Material: | 1.2343 Die Steel |
| Product: | Plastic Injection Mold |
| Standard: | JIS, DIN, En, ASTM, AISI |
| Design Software: | Autocad, Autocad/Ug/Solidworks, CAD |
| Size: | Customize |
| Color: | Customize |
| Feature: | Durable |
| Usage: | Bottle Caps Mold Insert |
| Company Info. |
| Senlan Precision Parts Co.,Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Core Insert molding, also known as encapsulation or multi-material molding (MMM), can be carried out in several ways. Smaller encapsulations may be placed into the mold and molded around via traditional processes. Special variations on traditional molding are used when particularly large core inserts, a high number of core inserts, or multiple dissimilar materials are needed for a part. The three most common varieties of core insert molding are multi-component injection molding, multi-shot injection molding, and overmolding.
| Item | Core Insert Parts |
|---|---|
| Material | Customized |
| Hardness | Customized |
| Place of Origin | Dongguan City |
| Brand | Senlan |
| OEM/ODM | Offered |
| Size | Standard or Customized |
| Packing | Plastic bag/bubble bag/wooden case |
| Production time | 15 days |
| Surface treatment | Laser-printing, Clear/black anodizing, Zinc Plating, Chrome Plating, Electroplating and Nitriding |
| Step | Business Process | Content | Time |
|---|---|---|---|
| 1 | Receive Inquiries | Confirm customer needs | 1 Day |
| 2 | Process An Order | Confirm customer order details | - |
| 3 | Put Into Production | Order raw materials/Arrange process department | 1-3 Days |
| 4 | Quality Inspection & Control | Coordinate machine and manual testing with test report | 10-30 Days |
| 5 | Product Packaging | Shipping department packaging per customer requirements | 1-3 Days |
| 6 | Product Outbound | Shenzhen Port | 1-3 Days |
| 7 | Product Acceptance | - | - |
A: We are a factory.
A: Around 15 days.
A: Yes, we provide samples. These samples are redundant but very cheap.
A: Product standard: model + size or drawing.
A: We have a quality control department that monitors quality from production start to product completion.
A: We maintain high-quality standards and produce satisfactory products. We ensure quality throughout the process.
|