Categories | Shutter Door Roll Forming Machine |
---|---|
Brand Name: | FMS |
Certification: | ISO CE |
Place of Origin: | CHINA MAINLAND |
MOQ: | 1 Set |
Price: | Negotiable |
Payment Terms: | L/C, T/T, D/A, D/P |
Supply Ability: | 20 Sets Per Month |
Delivery Time: | 30 Working Days |
Packaging Details: | 20' FLC |
Product Name: | Australia Roller Shutter Roll Forming Machine PL Touch Screen HMI |
Voltage: | 380V /50Hz/3pH or as Customer′s Requirements |
Production Capacity: | Hydraulic Pressure |
Dimension(L*W*H): | 45# Forged Steel |
Rolling thinckness: | Cr 12 High Grade Steel |
Roller material: | 45# steel with 0.05mm chrome |
Weight: | 5800x1400x1600mm(L*W*H) |
Cutting Type: | Hydraulic Cutting |
Suitable to Process: | Color Steel |
Company Info. |
Cangzhou Famous International Trading Co., Ltd |
Verified Supplier |
View Contact Details |
Product List |
Australia Roller Shutter Roll Forming Machine PL Touch Screen HMI
Main workflow of Australia Type Roller Shutter Door Making Machine:
Uncoiler ----- Molding core ----- Hydraulic System ----- Automatic
Control system ----- Step Formed Mechanism
-----Automatic Shearing Mechanism ----- Products Receiving Tables
Specification
Australia Roller Shutter Roll Forming Machine PL Touch Screen HMI | |
Material thickness | 0.3-0.8mm |
Diameter of shaft(solid shaft) | 70mm |
Material of shaft (solid shaft) | (high grade) 45# Steel, quenching and tempering treatment |
Material of roller | 45# steel polished and coated with chrome HRC55-60° |
Reducer | 8# cycloid reducer (high grade) |
Cutting | hydraulic cutting after roll forming |
Control system | PLC Frequency Control System with touch screen |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.