Categories | Automatic folding machine |
---|---|
Brand Name: | TONGYANG |
Model Number: | ZD-3300 |
Certification: | CE |
Place of Origin: | CHINA TAIZHOU TONGJIANG |
MOQ: | 1 |
Price: | 12000 USD |
Payment Terms: | T/T |
Supply Ability: | 1000 |
Delivery Time: | 7 days |
Packaging Details: | wooden box |
Folding width: | 3300mm |
power: | 2.2KW |
Folding items: | bed sheet, bedding bag, pillowcase |
Folding machine is used for sheet folding machine Computer control automatic folding machine,use bed sheet, bedding bag, pillowcase.
Sheet folding machine, folding machine series, the main technical
features: sheet folding machine adopts photoelectric switch
frequency control of motor speed control mechanism of action again,
is not only high accuracy in operation and energy saving province
electricity.
Bedding bag folding machine it is the present domestic folding
layer (layer can complete 32 fold), the maximum number of folding
the highest precision equipment.
Pillowcase level of folding machine folding is done by air jet,
cross folding is done through folding knife.
Automatic folding machine has the option, without folding small
material after ironing can be directly sent to the workbench.
Can automatic folding machine and various types of ironing machine,
ironing machine, is the major hotels, hotels, hospitals, textile,
railway and other industries preferred.
Automatic folding machine maintenance
A. Daily maintenance project
1. Check the compressed air pressure whether meet the requirements.
2. Eliminate the swelling in the gas source treatment components,
at the same time observe the oil mist detector in the situation of
the oil level, oil level should add enough.
3. Clear the dust on the surface of a photoelectric sensor.
4. Clean the surface exposed folding machine.
2. Weekly maintenance project
1. The sprocket, chain filling degree of lubricating oil and adjust
the chain tension.
2. The consistence of conveyor belt adjustment at a time.
3. Monthly maintenance project
1. On the conveyor roller add lubricating oil at a time.
2. The reducer for the first time after 300 h operation in an oil,
after running 1500 h after the replacement.
3. Check the connection of tighten.