Categories | Dog Treat Machine |
---|---|
Brand Name: | DARIN |
Model Number: | DR-200 |
Certification: | CE Certificate |
Place of Origin: | Jinan,Shandong Province |
MOQ: | 1 sets |
Price: | USD |
Payment Terms: | T/T, L/C, Western Union, D/A |
Supply Ability: | 50 Sets per year |
Delivery Time: | 35 working days after receiving the down payment |
Packaging Details: | We could supply Export Standard Wooden Case, suitable for long trip and loading & unloading. |
Machine name: | Pet jerky treat machine |
Usage: | Jerky Treats Dog Snacks |
Warranty: | 1 year |
Capacity: | 150kg/hr |
Power: | 18kw |
Dimension: | 4.3*0.9*2m |
Worker needed: | 1~2 workers |
Original: | China |
Material: | Stainless steel |
Company Info. |
Jinan Darin Machinery Co., Ltd. |
View Contact Details |
Product List |
Popular selling China 100% Natural Duck Jerky Dog Treats forming machine
Auto Pet jerky treat machine is an auto processing line can produce dog treat type jerky treats. With different moulds, various shapes can be made, such as strip, stick, screw shape, etc. Also, we can provide all kinds of recipe to make different tastes to full the demands of pet both for nutrition and chewing hobby.
Application: | Meat Foods. |
Machine Material: | Stainless Steel |
Type: | DR-126 |
Capacity: | 150kg/hr |
Certification: | CE & ISO9001 |
Place of Origin: | Jinan, Shandong, China. |
Motor: | WEG, Germany |
Electric Parts: | ABB, Switzerland or Schneider, France |
PLC and Touch Screen | Siemens, Germany |
Bearing: | NSK, Japan |
Voltage / Frequency: | Customized |
Operation: | PLC screen control. |
Payments: | T/T, L/C, |
Delivery time: | 35 working days. |
Machine Picture
Commissioning Service
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply
for the Visa to client’s country immediately; normally the vessel
needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our
engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production at shortest
time.
4. Our engineers have responsibility to train and teach the workers
how to operate, clean, maintain and repair all the machines, until
the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion
of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and
daily salary USD 100 are on client’s account.